22.10 Yeongdeok Mine Sunlight Plant Construction Site
페이지 정보
본문
In October 22, the site of the construction of the Yeongdeok Mine Sunkwang Plant.
⠀
The floating light method based on the water circulation has the risk of freezing during the cold winter season
Once operational, it operates 24 hours a day.
⠀
The large amount of sand pumps and water pumps needed to help the water circulate
The water circulating pipes will be completely wrapped in thermal insulation and will operate safely.
⠀
In the entire process, minerals on the conveyor belt are 20 to 25 tons per hour in real time.
Large storage facilities with a width of 5.4M, a height of 15M, and a size of 300 tons to store other minerals,
Silo has been installed.
⠀
Silos are designed to be used in the event of a failure of a motor or other conveyor device that requires a process during the light process
Spare facilities needed to continue the mining operations.
⠀
In addition, a 20M high bucket elevator was installed in the silo to store minerals that had been ground to a certain size.
There is a 5M drop between the bucket elevator and the silo
It will be operated in a natural fall method by connecting a 7M long pipe here.
⠀
If the work goes as planned, the completion is expected by the end of November.