Korea Molybdenum

Bulletin Board

Korea Molybdenum

December 05, 2025 Chungju Daehwa Mine Project Progress

페이지 정보

profile_image
작성자 최고관리자
댓글 0건 조회 9회 작성일 25-12-05 09:18

본문


 For safety purposes, protective floor-mesh (EX-METAL) guards were manufactured and installed on the rotating sections of each Belt Conveyor installed in the aggregate processing line.
 

 Furthermore, protective mesh guards were installed on the opposite rotary shafts of both the primary and secondary Vibrating Feeders.

 Separately, the EX-METAL mesh guards on the belt conveyors and the external railing supports fabricated with square pipe were painted.