Korea Molybdenum

Bulletin Board

Korea Molybdenum

November 25, 2025 Chungju Daehwa Mine Project Progress

페이지 정보

profile_image
작성자 최고관리자
댓글 0건 조회 15회 작성일 25-11-25 14:40

본문


 A belt-type automatic magnetic separator was installed at the inlet of the primary cone crusher.
This device is essential to prevent metallic fragments—such as lost tools or parts—from entering the crusher with the ore, which could cause severe abrasion and shorten equipment lifespan.

 In addition, the hydraulic pipelines between the Cone Crusher and the Hydraulic Power Unit (HPU) were connected, and the hydraulic pressure gauge panel was replaced.
The cone crusher operates via a hydraulic power system; oil circulation within the crusher must be active before the power switch can be engaged.
The HPU functions as a safety control system, ensuring proper hydraulic pressure and preventing overload during operation.